Reporting Repository
Reporting is an essential element of the Safe, Clean Water Program (SCWP) to track progress, quantify benefits, account for expenditures, and ensure transparency. Explore the Reporting Repository to learn about SCWP progress and access reports and plans for the Regional and Municipal Programs.
For more details on each of the report types available below and the SCWP Reporting timeline please visit the Reporting and Audits informational page.
Use dropdowns above to filter this table:
Watershed Area | Category | Document Type | Name | Report Period | Fiscal Year | Downloads |
---|---|---|---|---|---|---|
Upper San Gabriel River | Infrastructure Program (IP) Project | Quarterly Report | Glendora Avenue Green Streets | Mid-Year (Q1 - Q2; July - December) | FY24-25 | |
Rio Hondo | Infrastructure Program (IP) Project | Quarterly Report | East Los Angeles College Northeast Drainage Area and City of Monterey Park Biofiltration Project | Mid-Year (Q1 - Q2; July - December) | FY24-25 | |
Santa Clara River | Infrastructure Program (IP) Project | Quarterly Report | Via Princessa Park and Regional BMP Project | Mid-Year (Q1 - Q2; July - December) | FY24-25 | |
Upper San Gabriel River | Infrastructure Program (IP) Project | Quarterly Report | Barnes Park | Mid-Year (Q1 - Q2; July - December) | FY24-25 | |
South Santa Monica Bay | Infrastructure Program (IP) Project | Quarterly Report | Alondra Park Multi Benefit Stormwater Capture Project | Mid-Year (Q1 - Q2; July - December) | FY24-25 | |
Rio Hondo, Upper Los Angeles River | Scientific Study (SS) | Annual Report | Fire Effects Study in the ULAR Watershed Management Area | Annual | FY23-24 | |
Rio Hondo, Upper Los Angeles River | Scientific Study (SS) | Quarterly Report | Fire Effects Study in the ULAR Watershed Management Area | Q1 (July - September) | FY23-24 | |
Rio Hondo, Upper Los Angeles River | Scientific Study (SS) | Annual Report | Fire Effects Study in the ULAR Watershed Management Area | Annual | FY22-23 | |
Rio Hondo, Upper Los Angeles River | Scientific Study (SS) | Annual Report | Fire Effects Study in the ULAR Watershed Management Area | Annual | FY21-22 | |
Rio Hondo | Infrastructure Program (IP) Project | Annual Report | Merced Avenue Stormwater Capture Project | Annual | FY23-24 | |
Rio Hondo | Infrastructure Program (IP) Project | Annual Report | Burke Heritage Park & Marengo Yard Stormwater Capture Project | Annual | FY23-24 | |
Rio Hondo | Infrastructure Program (IP) Project | Annual Report | Kinneloa Yard Stormwater Capture Project Preliminary Design and Feasibility Study | Annual | FY23-24 | |
Rio Hondo | Infrastructure Program (IP) Project | Annual Report | Rio Hondo Ecosystem Restoration Project | Annual | FY23-24 | |
Rio Hondo | Infrastructure Program (IP) Project | Annual Report | Merced Ave Greenway (Phase I - South Residential Corridor) | Annual | FY23-24 | |
Rio Hondo | Infrastructure Program (IP) Project | Annual Report | Mt. Lowe Median Stormwater Capture Project | Annual | FY23-24 | |
Rio Hondo | Infrastructure Program (IP) Project | Annual Report | Plymouth School Neighborhood Stormwater Capture Demonstration Project | Annual | FY23-24 | |
Rio Hondo | Infrastructure Program (IP) Project | Annual Report | Rubio Wash Dry-Weather Diversion | Annual | FY23-24 | |
Rio Hondo | Infrastructure Program (IP) Project | Annual Report | Eaton Wash Dry-Weather Diversion | Annual | FY23-24 | |
Rio Hondo | Infrastructure Program (IP) Project | Annual Report | Alhambra Wash Dry-Weather Diversion | Annual | FY23-24 | |
Rio Hondo | Infrastructure Program (IP) Project | Annual Report | East Los Angeles Sustainable Median Stormwater Capture Project | Annual | FY23-24 |